A brick braai gives the fire a permanent home. The best place to start is with the cooking setup, the site and a clear plan for how everything fits together.
An open brick braai, a masonry chimney braai and a steel unit built into brickwork are different projects. They can share a similar finished look, but their supports, heat-facing materials and installation details are not interchangeable. Decide which one you want before ordering materials.
This guide walks through the choices and the order of work: location, dimensions, materials, construction, curing and upkeep. Use it to prepare your brief and shopping list, then work from the drawings and product instructions that apply to your build.
Start with the site
A few decisions on paper are much easier to change than a finished wall.
Watch the smoke path
Think about the wind, open doors and windows, neighbouring properties and where people will sit. A convenient spot becomes less useful if smoke regularly crosses the table.
Make room to use it
Leave useful space for tending the fire, carrying food and setting down hot utensils. Check the full movement of doors and grids. Keep combustible finishes out of the required clearance zones.
Check the ground and services
Identify paving, drainage and buried services before excavation. The base and supports need to suit the structure and ground conditions; a patio finish alone does not establish that it can carry the load.
Ask about the approvals
Confirm the route with your local building-control office before work starts. Include the chimney, boundary position and any roof or structural changes in the enquiry. Estate or body-corporate requirements may also affect the design.
Choose the kind of brick braai
Three common approaches. Pick the construction system first, then work out its dimensions.
01 / OPEN-AIR COOKING
A simple open masonry braai
A straightforward brick enclosure with a fitted grid keeps the project focused. It suits a genuinely open outdoor position where smoke can disperse. Decide how the grid and ash tray will be supported before the brick courses are set out.
Plan around the actual grid, a suitable fire-facing construction and a firm base. An open braai is not a solution for an enclosed room.
02 / A BUILT-IN GARDEN FEATURE
A brick braai with a chimney
A masonry hood and chimney add a different level of work. The opening, smoke gather, flue, support and weatherproofing need to work together. Settle those details with the person designing and building it before work starts.
Choose this for a properly planned permanent feature; chimney proportions should follow the design rather than a generic internet measurement.
03 / CHOOSE THE UNIT FIRST
Brickwork around a steel braai unit
A purpose-made steel insert gives you a defined cooking chamber and its own installation instructions. The brick surround still needs proper support, clearances and a correctly installed flue. Buy or select the exact unit before finalising the opening.
The nominal model size is not the finished brick opening. Use the manufacturer’s installation drawing, including space for expansion and insulation.
Understand the different braai steel typesPlan the fit before the brickwork
Start with the grid or the exact insert
Have the actual grid and ash tray available, or use the installation drawing for your selected steel unit. Work out how they will sit, lift out and be cleaned. Confirm the finished opening after allowing for brickwork, lining, supports and any required clearances.
Mark the footprint on the ground and stand in front of it. Check the reach to the back of the cooking area and the path to the preparation surface.
Most brick braais are built around a steel braai unit, so choose the unit first and build to its size. Compare our built-in braais, or start with a compact unit like the Homefires 700 Basic EconoMaster.
Separate the foundation from the fire bed
The foundation supports the weight of the structure. The hearth or fire bed deals with the heat above it. They do different jobs. Agree the foundation, any raised supports and the heat-facing construction as part of the design; do not choose slab thickness or reinforcement by copying a general diagram.
The illustrations explain the arrangement. They deliberately show no structural measurements.
Choose materials for their job
| Part of the build | What to decide | What to confirm |
|---|---|---|
| Outer brickwork | Clay facebrick or another specified structural finish | Exposure, appearance and the construction detail for the chosen design. |
| Masonry fire-facing surfaces | A suitable fired-clay construction or specified lining | The Clay Brick Association allows suitable fired-clay brick for domestic braais. Refractory brick is not an automatic requirement for every design. |
| Concrete and supports | The specified foundation, lintels or support system | Keep ordinary concrete products out of direct fire exposure unless the system specifically protects them. A structural base and a fire-facing layer are different parts. |
| Mortar and joints | Mortar selected for the particular area | Outer structural joints and hot inner joints may need different treatment. Follow the chosen brick or refractory-system guidance rather than one universal mix. |
| Steel insert and fittings | The exact model, grid supports, tray and doors | The manufacturer’s opening size, support, insulation and expansion allowances. |
| Chimney and weathering | The designed gather, flue, termination and roof detail | Draw, clearances, maintenance access and protection against water entry. |
Confirm the heat-facing brick and mortar combination with the supplier or designer. A material described simply as “building brick” is not enough information.
Build in a sensible order
Use this sequence to coordinate the work and the checks between stages. The construction details come from your agreed design.
Set out and check
Confirm the footprint, finished levels, cooking opening and preparation space. Dry-lay a representative course so the builder can check brick sizes, joints and cuts.
Prepare the foundation
Excavate and construct the specified base after checking services and ground conditions. Allow the required curing time before loading it with brickwork.
Build the supports
Keep courses level and corners plumb. Provide the agreed supports for the hearth, openings and any steel insert. Confirm hardware levels before closing up the masonry.
Complete the cooking chamber
Install the specified fire-facing construction, hearth and grid supports. For an insert, follow the supplied manual and protect the unit during surrounding building work.
Finish the hood and flue
Where included, build the gather and chimney to the design. Settle roof penetrations, flashing and termination details with the installer before finishing the surround.
Inspect before finishing
Check access, hardware fit, weatherproofing and the final opening. Remove debris, clean using the brick supplier’s instructions and agree the first-fire schedule.
Leave room for heat and time
A steel insert needs its specified allowance
Steel expands as it heats. Do not pack the body tightly into surrounding brickwork or guess the insulation detail. Use the clearances and materials in the exact unit’s manual; those details can differ between models and manufacturers.
Keep the fitting drawing with the builder’s brief, so the intended space is not accidentally filled during finishing.
Let the work cure before the first fire
Fresh mortar and supporting concrete need their specified curing and drying time. Follow the material and installation instructions, taking weather and recent rain into account. A surface that looks dry is not proof that the build is ready for heat.
Once cleared for use, start with the small first fire specified for the system. Stop and have unexpected cracking or smoke problems checked before increasing the fire.
Budget for the whole project
A useful quote covers more than a pile of bricks. Ask for the inclusions and exclusions in writing.
Base and building work
Include ground preparation, foundation, supports, brick quantities, mortar, labour and removal of building waste. Ask how cuts, waste and access affect the estimate.
Cooking equipment
Include the grid, ash tray, insert or firebox components, supports, doors and any accessories you have selected. Confirm what comes in the supplied package.
Flue and finishing
Allow for the chimney or flue, termination, roof work, flashing, insulation and final surface treatment where required. Obtain a current quote for your actual site.
Cleaning and inspection
Let ash cool fully before removing it. Keep the tray and cooking fittings clean, and check joints, supports and weatherproofing. Follow the brick supplier’s cleaning advice rather than applying an acid cleaner by default.
A few brick-braai questions
Do I need firebricks for a brick braai?
Not in every domestic design. The Clay Brick Association describes suitable fired-clay brick as an option for domestic braais. The right brick, hearth and joint detail depend on the system. Confirm the combination with the supplier; ordinary concrete brick is not a substitute for the heat-facing material.
Do I need council approval?
Ask the building-control office for your municipality about your exact project. Cape Town’s published guidance lists braais without chimneys among minor works that do not need building-plan approval. That is a local, specific distinction, not a blanket exemption for chimney braais throughout South Africa.
How many bricks will I need?
Count from the final drawing, actual brick dimensions and joint arrangement. Include the outer shell, supports, hearth, hood or chimney where present, then agree a cutting and waste allowance with the supplier. The opening size alone is not enough for a reliable quantity.
What height should the grid be?
Check a comfortable working position while allowing for the fire bed, adjustable grid and actual hardware. For a steel insert, work from the unit’s installation drawing. One standard height will not suit every cook, grid system or model.
How tall should the chimney be?
Its height, opening and termination depend on the braai design, surrounding rooflines and local conditions. Use the designed system and installer’s instructions. A single universal height or flue size does not establish that every installation will draw properly.
How soon can I light it?
Wait for the curing and drying period specified for the actual concrete, mortar and appliance installation, then follow the first-fire instructions. Recent rain or slow drying may affect the schedule. Do not assume that the same number of days applies to every build.
Choose the design. Then build the brief.
Start with the cooking setup you want, a measured site sketch and the questions for your builder or installer. With the hardware and construction details agreed, the brickwork can follow a clear plan.
Explore built-in braai ideas ↗References: Domestic braai planning — Clay Brick Association · Brick selection — Clay Brick Association · Built-in unit installation example — Lava Fires · Minor works guidance — City of Cape Town · Built-in support and expansion example — Infiniti Fires.